South Korea is building what could be the first large-scale data center designed, built and run by AI.
The project is called “Project Concord” & it could cost up to $35B and support 3GW of power. AI from Voltai would handle design, construction and operations, with humans only supervising. Scheduled for 2028.
AI Post 🪙 | Our X 🥇
The project is called “Project Concord” & it could cost up to $35B and support 3GW of power. AI from Voltai would handle design, construction and operations, with humans only supervising. Scheduled for 2028.
AI Post 🪙 | Our X 🥇